• Latest Update : Vasanth Vihar (as on 26-06-15)

    COMPOSITION OF VVARWA, YELAHANKA PROJECT

    OFFICERS Particulars      
    SL. NO   NAME & RANK DESIGNATION HOUSE NO CONTACT DETAIL EMAIL ID
    1 Brig K k Sood, VSM (Retd) President P2/57 9845184736 This email address is being protected from spambots. You need JavaScript enabled to view it.
    2 Maj Gen D Rajan, VSM (Retd) Vice President P6/19 9900783066 This email address is being protected from spambots. You need JavaScript enabled to view it.
    3 Lt Col P Chandra Shekharam (Retd) Secretary P1/58 9845714264 9986118123 This email address is being protected from spambots. You need JavaScript enabled to view it.
    4 Col BMP George (Retd) Treasurer P2/31 9449009753 This email address is being protected from spambots. You need JavaScript enabled to view it.
    5 Col M V Rangaiah, VSM (Retd) MemberPocket-1 P1/31 9845037619 This email address is being protected from spambots. You need JavaScript enabled to view it.
    6   Member Pocket-2      
    7 Lt Col M S Tyagi (Retd) Member Pocket-3 P3/A/405 8861026577 This email address is being protected from spambots. You need JavaScript enabled to view it.
    8 Col M S Salunke (Retd) Member Pocket-4 P4/15 9590399094 This email address is being protected from spambots. You need JavaScript enabled to view it.
    9 Col O V Kumar (retd) Member Pocket-5 P5/54 8095173444 This email address is being protected from spambots. You need JavaScript enabled to view it.
    10 Col S k Sinha (Retd) Member Pocket-6 P6/28 9632858303 This email address is being protected from spambots. You need JavaScript enabled to view it.
    11 Mrs. Reena Seethama Muthanna Lady Member P3/C/703 8050288685 This email address is being protected from spambots. You need JavaScript enabled to view it.


    CONSTRUCTION OF UNAUTHORIZED SUMPS

    * It has been noticed that allottees are making sumps in a reckless manner. This is contravention to the approved plans of Bangalore (Yelahanka Project).
    * Further the existing water supply system does not cater for the above.
    * Allottees are advised to refrain from construction of unauthorized sumps. In addition few allottees have also undertaken modification / development contrary to existing approved drawings.  This must not be undertaken.   In this connection please refer to Para 71 and 72 of AWHO Master Brochure - Jul 1987 (as amended).

     

    Site Plans Legend

    Pocket-1

    DSUA(DS)-VA1

    DSUA(SS)-VA2

    Pocket-2

    Pocket-3

     APARTMENTS

    Pocket-4

    DSUB(DS)-VB1

    DSUB(SS)-VB2

    Pocket-5

    All Pockets

     

     

    REGISTRATION CLOSED
  • Scheme

    REGISTRATION CLOSED

    Concept

    Independent Duplex Single Units in Single/Double Storey configuration and Apartments in Stilt +7 storeys configuration.

     

    Eligibility

    Army personnel (serving/retired), widows of army personnel and parents of unmarried Fatal Battle/ Other Casualties (if applying within five years of demise of their child) who are in receipt of family pension are eligible to apply. All the above categories should not be owners/allottees/registrants in any other AWHO scheme. Owners/Allottees (even those who have disposed off their earlier property allotted by AWHO) and existing registrants of Spot/Annual Registration schemes are not eligible to apply.

    Probable Date of Completion

    Construction of DUs completed.

    Contact Details

    Project Director

    Project Director
    AWHO Yelahanka (Vasant Vihar),
    House No P2-08, Billamaranahalli
    Yelahanka, Bangalore, Pin-562157.

     

    AWHO CUSTOMER RELATIONSHIP
    MANAGEMENT CELL


    011-23012619, 23792411,
    23792413, 23792416
    FAX : 011-23010599
    E-MAIL ID : This email address is being protected from spambots. You need JavaScript enabled to view it.

  • Latest Update : Sandeep Vihar (as on 06-04-21)

    PROJECT SANDEEP VIHAR BANGALORE WHITEFIELD blinking new

    Latest Update : Sandeep Vihar (as on 28-04-17)

    Minutes of Meeting held on 26 Mar 2017

    Update : Sandeep Vihar (as on 22-12-16)

    LATEST UPDATE

    Though the project is completed and handing over is in progress, update of the project and Minutes of Meetings held are being uploaded on website.

    You are requested to visit the website regularly for updates please.

    Update : Sandeep Vihar (as on 14-12-16)

     

    Important Letters dated

    * 17 Oct 2016
    * 02 Dec 2016* 06 Dec 2016

    Minutes of Meeting held on

    * 22 Mar 2016
    * 09 Jul 2016
    * 10 Sep 2016
    * 24 Oct 2016

     

     

    Update : Sandeep Vihar (as on 20-10-16)

    DOCUMENTS REQUIRED FOR FORMATION OF RWA/ ASSOCIATION/ MANAGING COMMITTEE - BANGALORE WHITEFIELD 

    Please click here for the attachments concerning Formation of RWA/ Association/ Managing Committee under the Provisions of KAOA 1972 - Bangalore Whitefield. It is intimated that Form ‘B’ is to be signed by the primary allottee. Date may be left blank. The sale deed is to be self-attested on each and every page by the allottee. All documents be submitted to the PD, Whitefield at the earliest for further action.

     

    Update : Sandeep Vihar (as on 20-09-16)

     

    RETICULATED GAS CONNECTIONS : H BLOCK OF BANGALORE, 

    1.         It is hereby intimated that as part of the project, Reticulated Gas Connection is being provided by AWHO. The Project Director (PD) and his team have been pursuing the vendor so as to complete this work at the earliest. However, work is getting hampered due to inaccessibility to certain DUs as they are either locked or the tenants are not making the premises available. The expenditure for installation of the Reticulated Gas Connection has already been charged to all allottees. It is in the allottees interest to contact the Project Director and get the Reticulated Gas Connection fitted at the earliest as the vendor has been given time till 30 Nov 2016 to complete the balance installations.

     

    2.         For further communications / clarifications, if any, please contact Project Director / the representative of the Vendor, Mr Raju Shukla ( Mobile – 7411078617) and Mr Nitin Parab (Mobile – 8828117571) & e-mail : This email address is being protected from spambots. You need JavaScript enabled to view it.).

     

    INTERCOM FACILITY (FIBER TO THE HOME (FTTH)

    1. It is intimated that as part of the package of your completed DU, Fibre To The Home (FTTH) which includes intercom, is to be provided by AWHO. The Project Director (PD) and his team have been pursuing with the vendor to get the work completed in all DUs. However, the work is hampered by inaccessibility to certain DUs either due to the DU being locked or due the tenants not making the premises available. The intercom and connected work has already been charged to the individual allottee. The vendor has been given time till 31 Oct 2016 to complete the balance installations. Hence, it is informed that it is in the allottees’ interest to get in touch with the PD and get the intercom fitted at the earliest.
    2. Further communications / clarifications, if any, may please be made directly with the Project Director / the representative of the Vendor, Mr Uday Shetti ( Mobile - 9945586694 / 9971788600 & e-mail : This email address is being protected from spambots. You need JavaScript enabled to view it.).

     

    Update : Sandeep Vihar (as on 18-08-16)

    LATEST UPDATE

    * The Handing/Taking Over of DU is still in progress. As on date 28 out of 1524 DUs only are balance. The allottees are being persuaded to expedite to taking over so as to enable attendance of the defects in already handed over DUs.

    * Handing over of common areas and amenities is in progress.

    * A Review Team consisting of Dy MD (T), Dir (Plg) and Dir (Cont) of this HQ visited and interacted with Management Committee (MC) on 09 Jul 16. The team was in location from 07 Jul to 09 Jul 16 and thereafter Dir (Plg) was in location till 15 Jul 16, to give impetus to the actions being taken to address the concerns of the allottees.

    * A detailed Minutes of Meeting has been issued which is available with Management Committee and PD.

    * Occupation Certificate for the project has been issued by Bangalore Development Authority (BDA).

     

    Update : Sandeep Vihar (as on 05-10-15)

    IMPORTANT NUMBERS


    Reception Cell No 1 : (For Block ‘D’, ‘E’ and ‘G’)
    Incharge : Sub Maj Ramanna 080-28453947
    Reception Cell No 2 : (For Block ‘A’, ‘B’, ‘C’ and ‘H’)
    Incharge : Sub Pushakar Singh (Retd)  080-28453957

    Project Director Mobile No 8072687694

    (From 9 am to 6 pm; including Sunday)

     

    HANDING / TAKING OVER INSTRUCTIONS : BANGALORE, WHITEFIELD (SANDEEP VIHAR)

    INSTALLATION OF POWER METERS FOR INDIVIDUAL DWELLING UNITS, GETTING ENERGISED AND OBTAINING RR NUMBER FROM BESCOM

    BANGALORE WHITEFIELD : DRAFT SALE DEED

    REGISTRATION OF DWELLING UNITS
    1. Sale Deed in respect of Bangalore, Whitefield (Sandeep Vihar) project, duly vetted and approved has been forwarded to Project Director for carrying out registration of the DUs.
    2. You are requested to study the document carefully for incorporating correct entries in respect of details pertaining to land and your dwelling unit (DU) / parking(s).
    3. AWHO will not be answerable for any wrong entries, once the Deed is registered.

     
    Sanction accorded by Govt of Karnataka for supply water to AWHO Complex at Bangalore East Taluk Bidarahalli Hobli, Kannamangala Village, Whitefield.

    VALUE ADDITIONS (SANDEEP VIHAR)


    Sandeep Vihar at Bangalore Whitefield is one of the largest projects of AWHO. It has a total of 1524 Dwelling Units. The amenities and facilities that are being provided here are on par with private builders at a comparatively low cost. Listed below are a few facilities that the allottees of Sandeep Vihar shall enjoy: Jaquar Bath Fittings, Capsule Lift, Dedicated Power House, Wooden Floorings, STP that will save 3 lakh litres of water daily, Car Charging Points and Wide Concrete Roads.

    Apart from these, following value addition have been done during the course of the project construction:-

    • CAUVERY WATER SUPPLY
    • FIBRE TO THE HOME
    • RETICULATED GAS SUPPLY
    • DEDICATED 66 KV SUB STATION
    • SPACE FOR CSD CANTEEN & ECHS
    • SPACE FOR BANK WITH 1600 LOCKERS
    • RECYCLED WATER SUPPLY SYSTEM FOR USE IN GARDENING AND FLUSHING
    • 50000 SQFT CLUB HOUSE AS AGAINST 15000 SQFT ORGINIALLY PLANNED

    ADDITIONAL SPORTS FACILITIES LIKE

    • COVERED BADMINTON COURTS - 02 Nos
    • BASKET BALL COURT -  01 No
    • SKATING RING FOR CHILDREN
    • ACRYLIC TENNIS COURTS -  02 Nos
    • GYM
    • CRICKET BOX
    • 1.80 KM LONG JOGGING TRACK
    • BILLIARD / SNOOKER
    • CHILDREN PLAY EQUIPMENT


    SITE PLAN / DU Numbering Plan (Zoom to view Specific DU Nos)

    PARKING NUMBERING PLANS

    Basement Parking

    Stilt Parking

    BLOCK A

    BLOCK A

    BLOCK B

    BLOCK B

    BLOCK C

    BLOCK C

    BLOCK D

    BLOCK D

    BLOCK E

    BLOCK E

    BLOCK G

    BLOCK G

    BLOCK H

    BLOCK H

    SAMPLE FLAT OF SMALL FAMILY APARTMENT

    SAMPLE FLAT OF MODERN APARTMENT

    SAMPLE FLAT OF LUXURY APARTMENT

    SAMPLE FLAT OF DELUXE APARTMENT

     

    REGISTRATION CLOSED


  • Scheme

    REGISTRATION CLOSED

     

    Eligibility

    Army personnel (serving/retired), widows of army personnel and parents of unmarried Fatal Battle/ Other Casualties (if applying within five years of demise of their child) who are in receipt of family pension are eligible to apply. All the above categories should not be owners/allottees/registrants in any other AWHO scheme. Owners/Allottees (even those who have disposed off their earlier property allotted by AWHO) and existing registrants of Spot/Annual Registration schemes are not eligible to apply.

    Probable Date of Completion

    Handing/Taking over in progress.


    Contact Details

    Col B Srinivas Project Director
    C/o HQ K & K Sub Area
    PIN - 900493
    C/O 56 APO
    Office Number : 25580116

    M : 08072687694

     

    AWHO CUSTOMER RELATIONSHIP
    MANAGEMENT CELL


    011-23012619, 23792411,
    23792413, 23792416
    FAX : 011-23010599
    E-MAIL ID : This email address is being protected from spambots. You need JavaScript enabled to view it.
  •  

    S No Type of DU Proposed Accommodation Nos Approx Area (in sq ft) Cost (Rs in Lacs) Registration Amount & Application Fee (Rs)
    (a) Small Family Apartment Living/Dining, Kitchen, 2 Bed Rooms, 2 Toilets and Balconies 56 1034 FOR LATEST COSTING 30,500/-
    (b) Modern Apartment Living/Dining, Kitchen, 2 Bed Rooms, 2 Toilets and Balconies 168 1224 50,500/-
    (c) Deluxe Apartment Lobby, Living/Dining, Kitchen, 3 Bed Rooms, 3 Toilets, Dress and Balconies 480 1721 75,500/-
    (d) Super Deluxe Apartment Lobby, Living/Dining, Kitchen, 4 Bed Rooms, 3 Toilets, Dress and Balconies 480 2062 90,500/-
    (e) Luxury Apartment Lobby, Living/Dining, Kitchen, 4 Bed Rooms, 4 Toilets, Dress and Balconies 240 2422 90,500/-
    (f) Deluxe Penthouse (PHC)

    Lower Level Lobby, Living/ Dining, Kitchen, 2 Bed Rooms, 2 Toilets, Dress, Staircase, Balconies and Terrace

    Upper Level
    Study, Family Lounge, Pantry/Utility, 2 Bed Rooms, 2 Toilets and Balconies

    40 3198 90,500/-
    (g) Super Deluxe Penthouse (PHB) Lower Level
    Lobby, Living/ Dining, Kitchen, 2 Bed Rooms, 2 Toilets, Dress, Staircase, Balconies and Terrace
    Upper Level
    Study, Family Lounge, Pantry/Utility, 2 Bed Rooms, 2 Toilets and Balconies
    40 3584 90,500/-
    (h) Luxury Penthouse (PHA) Lower Level
    Lobby, Living/ Dining, Kitchen, 2 Bed Rooms, 2 Toilets, Dress, Store, Staircase, Balconies and Terrace Upper Level
    Study, Family Lounge, Pantry/Utility, 2 Bed Rooms, 2 Toilets, Dress, Balconies and Terrace
    20 4128 90,500/-

  • IMPORTANT NOTICE

    * Allottees of Belgaum Ph- II Project are advised to remit funds through NEFT/RTGS /NET Banking to Syndicate Bank account of the Project.
    * Details are as follows :
    Name of Beneficiary : AWHO Belgaum Ph- II Project
    Bank A/c No : 91222160000138
    Bank Name : Canara Bank
    Bank Address : Kashmir House, Rajaji Marg, New Delhi-110011
    IFS CODE : CNRB0019122
    Type of account : SB
    * After effecting remittance, members are requested to follow up with a mail to AWHO indicating the UTR No and Regn No for linking with individual account of member.

    Update : Project as on 07-04-2020

    HANDING/TAKING OVER SCHEDULE OF AWHO PROJECT BELGAUM (KUDCHI)

    Due to COVID-19 outbreak and subsequent nationwide lockdown, Handing/Taking over of DUs shall re-commence wef 15 May 2020. This will be further reviewed in 1st week of May 2020 based on situation prevailing at that time.

    Update : Project as on 11-06-2020

    ELECTION FOR RWA AT AWHO CHITNIS VIHAR, BELGAUM blinking new small

    Update : Project as on 06-03-2020

    ELECTION FOR RWA AT AWHO CHITNIS VIHAR, BELGAUM

    Update : Project as on 11-11-19

    ELECTION FO RWA AT AWHO UMED VIHAR KUDHI, BELGAUM

    Update : Project as on 08-01-19

    REVISED HANDING/TAKING OVER SCHEDULE

    Update : Progress as on 31-12-18

    Project Progress (Including Land Cost) : 84.09%
    Constr Progress : 84.00%

    Update : Progress as on 30-11-18

    Project Progress (Including Land Cost) : 81.60%
    Constr Progress : 81.50%

    Update : Progress as on 31-10-18

    Project Progress (Including Land Cost) : 80.11%
    Constr Progress : 80.00%

    Update : Progress as on 30-09-18

    Project Progress (Including Land Cost) : 75.09%
    Constr Progress : 75.00%

    Update : Umed Vihar (as on 06-08-18)

    Progress of work is 68% as on 31 Jul 2018.

    Update : Umed Vihar (as on 06-02-18)

    Belgaum Kudchi Ph-II : Revision of Payment Schedule 

    Update : Umed Vihar (as on 12-01-18)

    Belgaum Kudchi project registration under RERA Karnataka with Registration number PR/KN/170731/000391

    Update : Umed Vihar (as on 03-10-17) 

    REVISION / POSTPONEMENT THE PAYMENT SCHEDULE 

    Update : Umed Vihar (as on 12-04-17)

    ALLOTMENT OF ADDITIONAL DWELLING UNIT (DU) TO THE EXISTING ALLOTTEES IN THE SAME STATION/ PROJECT 

    Update : Umed Vihar (as on 29-03-17)

    BELGAUM PHASE-II : REVISION OF PAYMENT SCHEDULE

    * The Belgaum Phase-II (Kudchi Village) project is progressing satisfactorily.  However, keeping in view the achievable work progress on ground; and to further fine tune the liability of payment of allottees, it has been decided to revise / postpone the   4th instalment (20% cost of dwelling unit (DU)) / 3rd instalment (25% cost of DU), as applicable, of the payment schedule issued to the allottees of the project, as given below :-

    Ser No Allottees Instalment No  Due Date
    Existing Revised
    (a) 4th instalment is 20% Cost of DU 4th May 2017 21 Nov 2017
    (b) 3rd instalment is 25% Cost of DU 3rd May 2017 21 Nov 2017
    (c) 3rd instalment is 25% Cost of DU (due after 18 May17) 3rd   21 Nov 2017

    * There is no change in the amount of instalments and other terms and conditions.  There is also no change with regards to the due date of other instalments.  
    * Allottees who have already made lump sum payment as per Para 4 (a) of the Booking letter may ignore this communication.
    * The inconvenience caused is regretted.

     

    OPENING OF REGISTRATION FOR PARA MILITARY PERSONNEL, COAST GUARD PERSONNEL & CIVILIANS PAID FROM DEFENCE SERVICE ESTIMATES 

     
    Update :  Umed Vihar (as on 29-08-16)

    CHOICE OF SPECIFICATIONS SENT TO ALLOTTEES

    OPENING OF REGISTRATION FOR AIR FORCE AND NAVAL PERSONNEL 

     

    Update :  Umed Vihar (as on 02-08-16)

    OMISSION OF SLIDING DOOR 

    1.Reference Para 9 of our Booking letter.
    2.The sliding door between the Living / Dining and the toilet on the ground floor of your DSU is being omitted and the opening being closed by block masonry.
    3.This is being done as the ‘Sliding door’ due to its nature of installation is not proving to be visually aesthetic.  
    4.This is for your information please.

    Update : Umed Vihar (as on 29-07-16)

    OPENING OF REGISTRATION FOR ASSAM RIFLES AND GREF PERSONNEL

     Update : Umed Vihar (as on 15-07-16)

    Specific Dwelling Unit draw was held on 14 Jul 2016 at HQ AWHO. 

    Registered users may log in and view their draw result.

    Update :  Umed Vihar (as on 08-07-16)

    OPENING OF REGISTRATION FOR PRIORITY–II APPLICANTS 

    DRAW FOR ALLOTMENT OF SPECIFIC DWELLING UNIT (DU) BELGAUM PHASE-II (KUDCHI VILLAGE) PROJECT 

    DU NUMBERING PLANS  

    LETTER TO ALL REGISTRANTS OF BELGAUM PHASE-II (KUDCHI VILLAGE)

    Tentative plan of proposed Dwelling Unit is uploaded.

     

  •  

    A regular scheme of independent houses is being constructed in Kudchi Village, Belgaum. The plot is about 3.87 acres. It is located on Belgaum-Sambra road at an approx distance of 13 km from the Cantonment (Maratha Light Infantry Regtl Centre). The project site is approx 12 km from the Railway Station and 05 km from the Airport. Phase-I of this project comprising of 22 Dwelling Units was constructed in 2001 and is approx 01 km from the present site

    Concept & Amenities

    The residential scheme comprises of 52 Duplex Single Units (DSUs) on a plot of 1500 sq ft (50 ft x 30 ft) each. The layout of the DSU is in G+1 configuration with a large open terrace. The project also comprises of a building to accomodate a Club House, Society Office and two shops.

    Eligibility

    As per Master Brochure.

    Probable Date of Completion

    Dec 2018


    Contact Details

    Project Director

    Army Welfare Housing Organisation

    Bldg No T-22, near Stn CSD Canteen

    Belgaum - 590009, Karnataka

    Tele/ Fax : 0831-2970172

    M : 09868582679

     

     

     

    AWHO CUSTOMER RELATIONSHIP
    MANAGEMENT CELL


    011-23012619, 23792411,
    23792413, 23792416
    FAX : 011-23010599
    E-MAIL ID : This email address is being protected from spambots. You need JavaScript enabled to view it.
  • Type of DUs and configurations

    Total No of Units

    Details of Accommodations

    Approx Super Area (Sqft)

    Tentative cost

    (Rs in Lacs)

    Registration Amount

    (Rs)

    Duplex Single Units in double storey configuration

    52

    Ground Floor

    Car Porch, Living /Dining room, One Bedroom, One Toilet, Kitchen, staircase & verandah

    First Floor

    Two Bedrooms, Two Toilets, Lobby, store, balcony, open terrace & staircase.


    1550 plus 392 sq ft of porch & terrace

     

    Latest Costing

    90,500/- (Incl Rs 500/- Application fee nonrefundable).

  • Update : As on 20-03-2023

    DEFECT RECTIFICATION OF THE DEFUNCT SEWAGE TREATMENT PLANT OF RAMAN VIHAR PROJECT 

    Update : As on 06-12-2022

    EXECUTION OF SALE DEED IN FAVOUR OF ALLOTTEES AT RAMAN VIHAR, COIMBATORE PROJECT 

    Update : As on 15-11-2022

    NOTICE RELATED TO THE REGISTRATION OF THE DWELLING UNIT IN RESPECT OF RAMAN VIHAR, COIMBATORE PROJECT 

    Update : As on 02-11-2022

    EXECUTION OF SALE DEED IN RESPECT OF DWELLING UNITS AT RAMAN VIHAR (COIMBATORE)

    Update : As on 28-10-2022

    COIMBATORE (RAMAN VIHAR) PROJ : TNRERA FINAL ORDER ON C. NOS 451 of 2019 106, 117 of 2020, 153, 226, 237 of 2021

    Update : As on 28-07-2022

    MINUTES OF VIDEO CONFERENCE HELD ON 06 JUL 2022 WITH RAMAN VIHAR APARTMENT OWNERS ASSOCIATION (RVAOA) AWHO PROJ RAMAN VIHAR AT COIMBATORE

    Update : As on 05-04-2022

    EXTN OF DEMAND SURVEY PERIOD FOR AWHO HOUSING PROJECT AT COIMBATORE PHASE-I (STAGE-II)

    1. Demand Survey for AWHO Housing Project at Coimbatore Phase-I (Stage II) is now open upto 31 May 2022.
    2. Applications are invited from eligible interested persons.
    3. For eligibility and application procedure, please click the original advertisement.

    Update : As on 24-01-2022

    EXTN OF DEMAND SURVEY PERIOD FOR AWHO HOUSING PROJECT AT COIMBATORE PHASE-I (STAGE-II)

    1. Demand Survey for AWHO Housing Project at Coimbatore Phase-I (Stage II) is now open upto 31 Mar 2022.
    2. Applications are invited from eligible interested persons.
    3. For eligibility and application procedure, please click the original advertisement.

    Update : As on 21-10-2021

    EXTN OF DEMAND SURVEY PERIOD FOR AWHO HOUSING PROJECT AT COIMBATORE PHASE-I (STAGE-II)

    1. Demand Survey for AWHO Housing Project at Coimbatore Phase-I (Stage II) is now open upto 31 Dec 2021.
    2. Applications are invited from eligible interested persons.
    3. For eligibility and application procedure, please click the original advertisement.

    Update : As on 05-10-2021

    DRAFT SALE DEED IN RESPECT OF COIMBATORE (RAMAN VIHAR) PROJECT 

    Update : As on 17-09-2021

    OPENS DEMAND SURVEY FOR AWHO HOUSING PROJECT AT COIMBATORE PHASE-I (STAGE-II) FROM 20 SEP 2021 TO 25 OCT 2021 

    WILLINGNESS / UNWILLINGNESS FROM EXISTING WAITLISTED REGISTRANTS OF COIMBATORE PROJECT

    Update : As on 08-09-2021

    UPDATE : ARMY WELFARE HOUSING ORGANISATION RAMAN VIHAR, COIMBATORE PROJECT (DEMAND SURVEY) 

    Update : As on 23-08-2021

    VISIT OF MAJ GEN VIKAL SAHNI,SM,VSM (RETD) MANAGING DIRECTOR AWHO TO RAMAN VIHAR, COIMBATORE ON 09 AUG 2021 

    Update : As on 10-03-2021

    CONFIRMATION OF RESULTS OF E-GBM OF RAMAN VIHAR, COIMBATORE PROJECT 

    Update : As on 23-02-2021

    TNRERA REGISTRATION OF AWHO COIMBATORE, PHASE - I 

    1. It is intimated that vide its order dated 17 Feb 2021, TNRERA has ordered registration of the project with TNRERA on or before 24 Feb 2021. Action is at hand for compliance with the order.

    2. A registration fee of Rs 12,51,788/- (Rupees twelve lakhs fifty one thousand seven hundred thirty eight only) is required to be paid upfront alongwith application for TNRERA registration. The same is being paid out of Society Corpus Fund of the project, since the Project Fund is in the negative as on date.

    3. It is further intimated that costs towards TNRERA registration including the Registration Fee, Consultancy charges and other incidental expenditure for ibid TNRERA registration of the project and follow up actions shall be recovered from allottees proportionate to super area of their DUs. Exact amount of the same shall be intimated as and when final state of expenditure is known.

    4. This is for information of all concerned.

    Update : As on 17-02-2021

    EXPENDITURE ON MAINTENANCE OF PROJECT RAMAN VIHAR COIMBATORE OUT OF CORPUS FUND

    Update : As on 22-12-2020

    Tour Notes cum Minutes of the Meeting held with allottees at site during visit of Dy MD (Tech) on 12 Dec 20 

    Update : As on 04-12-2020

    AWHO PROJECT RAMAN VIHAR COIMBATORE

    1. Dy MD (Technical ) Brig DN Bhatt will be visiting AWHO Proj Raman Vihar Coimbatore site on 12 Dec 20 to inspect the progress on rectification of defects. Allottees if desirous of interacting with Dy MD (Technical) may assemble in Community Hall on 12 Dec 20 at 1200hrs, keeping social distancing norms in view.

    2. Only allottees are requested to interact with the Dy MD on their issues. No tenants will be entertained

    Update : As on 06-10-2020

    NOTICE FOR ALLOTTEES OF RAMAN VIHAR, COIMBATORE PROJECT

    1. Refer directions of the Principal Secretary, Housing & Urban Development Department & Chairman (TN RERA), Chennai to IG (Registrar) for non registration of DUs (copy attached).

    2. AWHO has decided to challenge the above mentioned direction / order before the Appellate Authority to facilitate the allottees to recommence the process of registration of their sale deeds.

    Update : As on 02-09-2020

    MINUTES OF VIDEO CONFERENCE WITH ALLOTTEES OF RAMAN VIHAR, COIMBATORE HELD ON 23 AUGUST 2020 

    Update : As on 28-08-2020

    FACILITY MANAGEMENT CHARGES RAMANVIHAR (AWHO), CHINNAVEDAMPATTI COIMBATORE

    Update : As on 21-08-2020

    COIMBATORE (RAMAN VIHAR) VIDEO CONFERENCE : 23 AUG 2020 (1100HRS)

    1. The video conference will commence at 1100hrs on 23 Aug 2020. The link will be active at 1045hrs on 23 Aug 2020. The sequence of video conference will be as under :-
    (a) Issues pertaining to the Coimbatore project will be clarified in the first 20-25 minutes by MD and reps of AWHO.
    (b) Views of senior officer allottees of the project will be solicited.
    (c) Open session.

    2. It is requested that due decorum be maintained during the conduct of the video conference.

    Update : As on 14-08-2020

    COIMBATORE (RAMAN VIHAR) : VIDEO CONFERENCE

    1. A video conference through Google Meet is being scheduled between AWHO and allottees of Raman Vihar Coimbatore project on 23 Aug 2020 at 1100 hrs to clarify a few issues and amicably resolve other issues.
    2. You are requested to confirm your attendance for the same alongwith your GMail id that you will be using at This email address is being protected from spambots. You need JavaScript enabled to view it.. In case you do not have a Gmail id you are requested to kindly create a GMail id for the video conference and intimate the same to us alongwith your confirmation.
    3. Project Director, Coimbatore will also make central arrangements (keeping social distancing norms) for allottees residing within the project so as to facilitate their attendance. In case you are residing within the project, you are also requested to confirm your attendance for the central arrangement at the above given mail id.
    4. The confirmation should reach us latest by 1700 hrs on 19 Aug 2020(Wednesday). Confirmations received after 1700 hrs on 19 Aug 2020 will leave insufficient time for AWHO to make arrangements, thus may not be accepted.

    Update : As on 18-02-2020

    ARBITRATION / COURT CASES UPDATE/PROGRESS

    Contracts concluded with M/S Sreedevi Infra Constructions Pvt Ltd was cancelled due to default of contractor and balance work has been completed through other agency at Risk & Cost of Contractor. Arbitration award has been published by Sole Arbitrator in favour of AWHO which has been challenged by Contractor in High Court, Delhi. Any amount received by AWHO through decree of court after exhausting all legal remedies by both the parties, shall be credited to Project Account.

    Update : As on 30-01-2020

    FACILITY MANAGEMENT CHARGES AWHO PROJECT COIMBATORE 

    Update : As on 19-12-19

    ALLOTTEE's ISSUES 

    Update : As on 23-09-19

    OPENS DEMAND SURVEY FROM 23 SEP 2019 TO 22 NOV 2019 

    Update : As on 16-05-19

    UPDATE : COIMBATORE (RAMAN VIHAR) 

    The AWHO is constrained to inform the allottees of Raman Vihar, Coimbatore Project that the formation of Adhoc User Committee as a prelude to the formation and registration of Association of Apartment Owners and subsequent handing over the maintenance of all Common Amenities and Services in the Project to the duly formed Association are kept in abeyance in view of pendency of a Writ Petition filed by the President of RVAOA against the AWHO at the High Court of Madras.

    Update : As on 06-05-19

    MINUTES OF THE MEETING HELD ON 24 MAR 2019 

    Update : As on 29-03-19

    It has been decided that no caretaking charges (for all types of dwelling units) in Coimbatore (Raman Vihar) project be levied till commencement of registration of the properties of the project.

    Update : As on 22-03-19

    NOTICE REGARDING MEETING WITH ALLOTTEES 

    Update : As on 07-03-19

    NOMINATION OF AUC AND FORMATION OF RWA 

    Update : As on 05-03-19

    CLARIFICATION ON LAND TO PHASE-I ALLOTTEES OF RAMAN VIHAR PROJECT COIMBATORE 

    Above letter has already been forwarded to all allottees by Email.

    Update : As on 07-02-19

    CIRCULAR TO ALLOTTEES FOR TIMELY PAYMENT OF PROPERTY TAX 

    1. All allottees are required to pay the property tax for their respective DUs for the period of 01 Oct 2018 to 31 Mar 2019 and on a half yearly basis thereafter.

    2. The payment of Property Tax may be done online by logging into the Coimbatore Municipal Corporation website www.ccmc.gov.in. Payment can also be made in Cash/ DD/ Cheque at the Coimbatore North Zone Corporation tax office branches.

    Update : As on 31-01-19

    CLARIFICATION ON LAND TO PHASE-I ALLOTTEES OF RAMAN VIHAR PROJECT COIMBATORE

    Update : As on 30-01-19

    LATEST UPDATE

    Update : As on 08-01-19

    Revised due date of commencement of caretaking charges for all types of DUs in Coimbatore project is 31 Jan 2019.

    Update : As on 19-12-18

    MINUTES OF ALLOTTEES MEETING

    Update : As on 11-12-18

    LATEST UPDATE

    Latest Update : As on 27-11-18

    POSTPONEMENT : ALLOTTEES  MEETING

    Allottee meeting scheduled at 1100h on 28 Nov 2018 is postponed to 09 Dec 2018 as per request received from a number of allottees on telephone and through e-mail. Inconvenience caused is regretted.

    Update : As on 22-11-18

    CIRCULAR 

    Update : As on 20-11-18

    ALTERNATION/MODIFICATION IN DUS : RAMAN VIHAR, AWHO PROJECT, COIMBATORE

    Update : As on 25-10-18

    Update of Individual Running Ledger Account (IRLA)

    (a) Immediately after transferring amount through bank, allottees are required to intimate Registration No,  UTR/NEFT No with  Date of Transaction and amount details by e-mail to AWHO.
    (b) Members are requested to wait for a minimum period of 15 days before raising any queries on updation of account/non-issue of receipt.

     

    Update : Raman Vihar (as on 10-09-18)

    Progress of work is 98% as on 31 Aug 2018.

    Update : Raman Vihar (as on 07-09-18)

    COIMBATORE : Allottee Meeting

    COIMBATORE : JUDGEMENT SUPREME COURT OF INDIA 

    Latest Update : Raman Vihar (as on 23-08-18)

    COIMBATORE : LATEST UPDATE

    Update : Raman Vihar (as on 17-07-18)

    ESTABLISHMENT OF RECEPTION CELL : COIMBATORE PROJECT 

    (a) A reception Cell has been established at the Raman Vihar Complex to facilitate the handing/taking over of DUs.
    (b) Allottees are requested to contact Rxn Cell regarding any clarification related to handing/taking over and before scheduling their visit to the site. The contact details of reception Cell are as under:-
       (i) Land line number - 0422-2976699
       (ii) Nk A Karthik A, JE (Civ) - Mob 7051098858

    Update : Raman Vihar (as on 06-07-18)

    An Update on AWHO Project, Coimbatore. 

    Update : Raman Vihar (as on 30-06-18)

    Progress of work is 96.5% as on date.

    Update : Raman Vihar (as on 14-05-18)

    Amendement to Para 7 of handing/taking over instruction of Coimbatore project.

    Update : Raman Vihar (as on 02-05-18)

    An Update on AWHO Project, Coimbatore 

    Update : Raman Vihar (as on 11-04-18)

    COIMBATORE : UPDATE AND REVISION OF PAYMENT SCHEDULE 

    Update : Raman Vihar (as on 04-04-18)

    IMPORTANT NOTICE 

    1. All site Engrs are busy in financial closure of accounts and physical verification of works.
    2. ln view of the above no Engrs can be deputed to conduct visit of allottees or their relatives to the AWHO site till 11 Apr 2018. Thereafter, allottees can visit the site as per schedule given below:-
    (a) Wednesdays : 1400 hrs 1700 hrs
    (b) Saturdays : 0900 hrs 1300 hrs
    3. Allottees may contact Project Director in advance to plan their visit at site or for any site clarification.

    Update : Raman Vihar (as on 28-03-18)

    HANDING TAKING OVER INSTRUCTION .

    Update : Raman Vihar (as on 21-02-18)

    Progress of work is 87% as on 31 Jan 2018.

    Update : Raman Vihar (as on 06-02-18)

    The results of the Coimbatore (Raman Vihar) project draw for specific DU & parking held on 17 Jan 18 have been declared. The same has been intimated to the allottees through their registered e-rnails. Allottees are welcome to visit the project office after prior intimation to see the progress & sample flat only.

    Update : Raman Vihar (as on 19-01-18)

    * Allottees of Coimbatore project are requested to visit their allotted DU or sample DU with prior intimation to Project Director, Coimbatore to avoid unnecessary inconvenience.

    * Address and Contract details of the Project Director is as under :-

    Col S Chakraborty, Project Director Coimbatore
    Army Welfare Housing Organisation
    Anna Nagar, Chinnavedampatti – Post
    Coimbatore – 641049.
    Tele : 0422 - 2666057 / 3191007 (Off)
    08527601666 (Mobile)

    Update : Raman Vihar (as on 18-01-18)

    Coimbatore (Raman Vihar) project draw  for specific DU & parking held on 17 Jan 18.  Allottees are welcome to visit the project office after prior intimation to see the progress & sample flat only.

    DUs LAYOUT PLAN 

    Update : Raman Vihar (as on 11-01-18)

    EXTRACTS OF FEEDBACK RECEIVED FROM ALLOTTEES OF AWHO PROJECT AT COIMBATORE 

    Update : Raman Vihar (as on 13-12-17)

    DRAW FOR SPECIFIC DU NO, FLOOR & PARKING SPACES 

    The draw for specific DU No, Floor & Parking spaces of Coimbatore project will now be held on 17 Jan 2018 (Wednesday) at HQ AWHO, Kashmir House, New Delhi from 1030 hours. Allottees are welcome to attend the draw under own arrangements.

    Allottees who have already submitted their options need not send the options again. However, allottees who have not yet submitted their options are requested to exercise their options. Options (duly completed), should reach HQ AWHO the latest by 05 Jan 2018.

    Update : Raman Vihar (as on 07-12-17)

    Progress of work is 79% as on 30 Nov 2017.

    Update : Raman Vihar (as on 07-11-17)

     POSTPONEMENT OF PDC: COIMBATORE PROJECT 

    1. Due to unavoidable circumstances/technical reasons the Probable Date of Completion (PDC) of the project is being revised to 31 Mar 2018.
    2. There is NO change in the amount of installments and other terms and conditions.
    3. Inconvenience caused is regretted.

    Update : Raman Vihar (as on 20-10-17)

    Amendments in option letter for Coimbatore project for allottees of LXA type of DU 

    Update : Raman Vihar (as on 12-10-17)

    POSTPONMENT OF COMPUTERISED DRAW FOR ALLOTMENT OF SPECIFIC DU NO & PARKING SPACES 

    The draw for specific DU No, Floor & Parking spaces for Coimbatore project scheduled to be conducted on 31 Oct 2017 has been postponed, due to unavoidable circumstances/technical reasons. The fresh date will be intimated shortly. However, allottees who have not yet submitted their options are requested to exercise their options immediately.

    Update : Raman Vihar (as on 25-09-17)

    SUGGESTION/ FEEDBACK RECEIVED FROM ALLOTTEES

    Update : Raman Vihar (as on 17-08-17)

    COIMBATORE : AMENDMENT TO OPTION LETTER (MDA ALLOTTEES ONLY) 

    Update : Raman Vihar (as on 25-07-17)

    OPTION LETTER FOR SPECIFIC FLOOR AND PARKING SPACE 


    Update : Raman Vihar (as on 16-06-17)


    Update : Raman Vihar (as on 08-05-17)

    Progress of work is 74% as on 30 Apr 2017.

    UPDATE : COIMBATORE (RAMAN VIHAR) 

    Dy MD (Tech) visited AWHO Project site of Coimbatore (Raman Vihar) on 19 Apr 17 to carry out on site review of the progress of work. All aspects of the project like progress, quality, status of services, provision of amenities etc have been reviewed in detail, keeping in mind the revised PDC of Dec 17. The progress is on track to be able to commence handing over of DUs by Dec 17. Accordingly, the Option Letter is being issued shortly followed by draw of lots which, tentatively, is scheduled for Jul 17.

     

    Update : Raman Vihar (as on 19-04-17)

    Progress of work is 72% as on 31 Mar 2017.

    Update : Raman Vihar (as on 12-04-17)

    ALLOTMENT OF ADDITIONAL DWELLING UNIT (DU) TO THE EXISTING ALLOTTEES IN THE SAME STATION/ PROJECT 


    Update : Raman Vihar (as on 07-03-17)

    POSTPONEMENT OF PDC: COIMBATORE PROJECT 

    * The Coimbatore project was retendered in Feb 2016. Since then the work has progressed from 41% to 70% as on date. The work of main contract is going on as per schedule. It is assured that all efforts are being made to commence handing over wef Dec 2017.
    * However, the Probable Date of Completion (PDC) of the project is being revised to Dec 2017. The revision has been necessiated due to delay in approval of STP and External Electric Supply System by local auth.
    * There is NO change in the amount of installments and other terms and conditions.
    * Inconvenience to the allottees is regretted please.


    Update : Raman Vihar (as on 02-03-17)

    Progress of work is 70% as on 28 Feb 2017.

     

    Update : Raman Vihar (as on 13-12-16)

    OPENING OF REGISTRATION FOR PARA MILITARY, COAST GUARD & CIVILIANS PAID FROM DEFENCE SERVICE ESTIMATES PERSONNEL 

     

    Update : Raman Vihar (as on 02-12-16)

    Progress of work is 68% as on 30 Nov 2016.

     

    Update : Raman Vihar (as on 07-11-16)

    Progress of work is 65% as on 31 Oct 2016.

     

    Update : Raman Vihar (as on 12-09-16)

     COST REVIEW OF ROW HOUSE IN COIMBATORE PROJECT

    After analysis of the finances in Coimbatore Project, the cost of Row Houses being constructed has been reviewed and the latest costing has been pegged at Rs. 57,19,508/-. Necessary cost adjustments to previous allottees of Row House will be done at the time of preparation of Final Statements of Accounts.

    Progress of work is 56% as on 31 Aug 2016.

    Update : Raman Vihar (as on 08-08-16)

    Progress of work is 52% as on 31 Jul 2016.

    Pls refer to letter regarding amendments in Small Family Apartment (at link below).

    As only one allottee has responded, no modifications to the original plan shall be undertaken.

    PROPOSED AMENDMENTS TO SMALL FAMILY APARTMENT (SFA) AWHO PROJECT AT COIMBATORE 

     

     Update : Raman Vihar (as on 22-07-16)

    REVISION OF PAYMENT SCHEDULE 


    Update :Raman Vihar (as on 08-07-16)

    OPENING OF REGISTRATION FOR AIR FORCE & NAVAL PERSONNEL 

    OPENING OF REGISTRATION FOR ASSAM RIFLES & GREF PERSONNEL 

    Progress of work is 49% as on 30 Jun 2016.

    RECOMMENCEMENT OF CONSTRUCTION : AWHO PROJECT AT COIMBATORE 

     

     Consequent to cancellation of original contract, the risk and cost tender has been concluded.  Based on lowest quote received, the revised costing of DUs would be as under:-

    Ser No Type of DUs Total Cost Difference (Rs in Lakhs)
    Existing
    (Rs in Lakhs)
    Revised
    (Rs in Lakhs)
    (a) SFA 18.20 19.67 1.47
    (b) MDA 25.70 27.80 2.10
    (c) DXA 32.30 34.93 2.63
    (d) SDA 39.80 43.05 3.25
    (e) LXA 45.00 48.67 3.67
    (f) RH 43.60 46.55 2.95

     Difference of existing and revised cost of DUs is to be recovered from the defaulted Contractor.  Pending the outcome of Arbitration Judgement, the allottees will be required to pay the difference in cost which will be refunded once recovery is made from the Contractor.

     In view of the fact mentioned at Para 2 above, allottees are required to pay the difference of amount in three installments which has been added on a proportionate basis to the existing installments as given below :-

    Type
    of DUs
    Difference
    (Rs in Lakhs)
    Difference Amount to be Paid in Addition to Amount of Installments Intimated Earlier
    Due date 4th/3rd  of instalment
    (20% cost of DU)
    Due date 5th/4th of instalment
    (15% cost of DU)
    Last installment 5% Cost of DU,
    cost of Parking & Escalation
    01 May 2016/
    18 Oct 2016/
    24 Nov 2016
    31 Aug 2016/
    18 Jan 2017/
    02 Mar 2017
    To be intimated later
    SFA 1.47  Rs 74,000/- Rs 55,000/- Rs 18,000/-
    MDA 2.10 Rs 1,05,000/- Rs 79,000/- Rs 26,000/-
    DXA 2.63 Rs 1,32,000/- Rs 99,000/- Rs 32,000/-
    SDA 3.25 Rs 1,63,000/- Rs 1,22,000/- Rs 41,000/-
    LXA 3.67 Rs 1,84,000/- Rs 1,38,000/- Rs 45,000/-
    RH 2.95 Rs 1,48,000/- Rs 1,11,000/- Rs 37,000/-

     The difference of amount calculated  must be added to the amount of installments to be paid on the dates as per the payment schedule.

    AWHO will make all efforts to keep the final cost within the amount mentioned. PDC of the project is JUN 2017.

     