    DEMAND SURVEY FOR ALLAHABAD (KALINDIPURAM) OPENED WEF 09 FEB 2017 TO 09 APR 2017

    Demand Survey for a JJAY project at Allahabad (Kalindipuram) has been ongoing wef 28 Feb 2014. However, due to low subscription it is being closed and a fresh regular project for all ranks is being planned now. A Demand Survey is thus being done to ascertain the demand for DUs for all ranks (Serving & Retired) for Allahabad (Kalindipuram). The project will be launched only in case adequate demand exists. Click here to know more.

     

    Latest Update (as on 03-03-14)


    JJAY ALLAHABAD DEMAND SURVEY PH-II

    Phase-1 PROJECT COMPLETED.

  • General

    The JAI JAWAN AWAS YOJNA has been conceived by Gen JJ Singh, PVSM, AVSM, VSM, ADC, erstwhile Chief of the Army Staff, and aims to provide low cost housing for serving JCOs and ORs of the Indian Army.

     

    Scheme

    Demand Survey Ph-II Opened.

     

    Location

    The site for the present project is at Kalindipuram, Allahabad, and is located at distances of approx 5.5 km and 6.0 km from the Main Railway Station and Cantt respectively. The land has been purchased from Allahabad Development Authority (ADA).

     

    Concept

    The DUs have been planned in 24 blocks of ground plus two configuration on a plot of size 2.2 acres.  The site has a 30 m wide road on the southern side, while an 18 m wide road exists on the western side.  Accordingly two entry/exist gates are being provided on to these roads. All blocks have a 9 m wide road in front of them, and a central green has been provided in the centre of the plot. The area is fully developed and all the infrastructural facilities like water supply, electricity, sewage, etc shall be provided by the ADA.

     

    Eligibility

    1. The scheme is open only for serving/retired JCOs and Other Ranks (OR) & their widows in receipt of family pension from CDA(P) Allahabad provided they are not in possession of any other DU from the AWHO or are not allottees/registrants in any other AWHO schemes.

    2. The applicant / wife / dependent children should not own any residential property in Allahabad, which has been allotted by any Govt agency like Allahabad Development Authority etc.

     

    Probable Date of Completion

    Construction Completed.

     

    Contact Details

    The Project Director
    Army Welfare Housing Organisation
    Near Sub Area CSD Canteen
    Signal Centre Building
    New Cantt, Allahabad
    Tel : 0532-2421260

     

     

  • Configuration & Cost

    Type of DUs and Configuration No of DUs Accommodation Approx Super Area
    (Sq. ft)
    Tentative Cost (Rs) Registration Amount(Rs)
    Jai Jawan Apartments (Ground +2) 144 Two Bedrooms, Multipurpose Room, one Toilet, one WC, Kitchen and Verandah/ Balcony 640 FOR LATEST COSTING 30,500/- (including Rs 500/- Application Fee - Non refundable