• IMPORTANT NOTICE

    * Allottees of Kochi Silver Sand Island Project are advised to remit funds through NEFT/RTGS /NET Banking to Syndicate Bank account of the Project.
    * Details are as follows :
    Name of Beneficiary : AWHO Kochi Silver Sand Island Project
    Bank A/c No : 91222160000215
    Bank Name : Syndicate Bank
    Bank Address : Kashmir House, Rajaji Marg, New Delhi-110011
    IFS CODE : SYNB0009122
    Type of account : SB
    * After effecting remittance, members are requested to follow up with a mail to AWHO indicating the UTR No and Regn No for linking with individual account of member.

    Latest Update : Chander Kunj (as on 16-12-16)

    OPENING OF REGISTRATION FOR PARA MILITARY FORCES & CIVILIANS PAID FROM DEFENCE SERVICE ESTIMATES blinking new

    Latest Update : Chander Kunj (as on 23-11-16)

    Progress of work is 79% as on 31 Oct 2016.

    OPTION LETTER FOR SPECIFIC FLOOR AND PARKING SPACE 

     


    Update : Chander Kunj (as on 04-10-16)

    Progress of work is 75% as on 30 Sep 2016.

     

     Update : Chander Kunj (as on 27-09-16)

    Based on the progress of construction, it has become necessary to revise the PDC of the project from Dec 2016 to Jun 2017. The inconvenience caused due to this unavoidable change of PDC is regretted.

     

     Update : Chander Kunj (as on 10-08-16)

    Progress of work is 71.50% as on 31 Jul 2016.

     

     Update : Chander Kunj (as on 08-07-16)

    Progress of work is 69% as on 30 Jun 2016.

    OPENING OF REGISTRATION FOR AIR FORCE AND NAVAL PERSONNEL 

    AWHO SILVER SAND ISLAND KOCHI : ROOF TOP PERGOLA 

    OPENING OF REGISTRATION FOR ASSAM RIFLES & GREF PERSONNEL 

    OPENING OF REGISTRATION FOR PRIORITY–II APPLICANTS

     KOCHI SSI : SAMPLE FLAT VIDEO 

    ENVIRONMENTAL CLEARANCE FOR SSI KOCHI

    REVISION OF PAYMENT SCHEDULE : SILVER SAND ISLAND, KOCHI PROJECT 

    1. Further to our letter of even No dated 31 Dec 2014 and Para 40 of AWHO Master Brochure- Jul 1987 (as amended).
    2. Based on progress of construction, it has become necessary to revise the payment schedule of the above project. The instalments have been postponed as under :-
    (a) Allottees Whose 5th Instalment is Due for Payment on 14 Apr 2016.

    Ser No

    Instalment No

    Type of Payment

    Due Date

    For

    Read

    (i)

    5

    15% Cost of DU

    14 Apr 2016

    14 Aug 2016

    (b)  For Late Allottees Whose 4th Instalment is due on 17 Jun 2016.


    Ser No

    Instalment No

    Type of Payment

    Due Date

    For

    Read

    (i)

    4

    15% Cost of DU

    17 Jun 2016

    14 Aug 2016

    3.There is No change in the amount of instalment and other terms and conditions including Probable Date of Completion (PDC).
    4. Initial allottees who have already made lump sum payment as per Para 4 (a) of the Booking letter may ignore the communication regarding postponement of instalment.

     

    CONSTRUCTION OF FLYOVER AT VYTTILA JN NEAR AWHO COLONY AT KOCHI 


    Government of Kerala has accorded approval for a fly over at Vyttila junction which is a very prominent junction on bye pass of NH 47 and state high way Ernakulum – Kottayam  (main access to Silver Sand Island). This will reduce the traffic congestion at Vyttila which is a traffic hub consisting of Inter State Bus Terminus, Metro Station and Water Transport.  All of these are at a walking distance from the ongoing AWHO project site. This factor affects appreciation and adds to the project value.

     

    Sample flat is ready. Photographs of the same are uploaded. Allottees may also visit the sample flat.


    VYTTILA-KAKKANAD BOAT SERVICE LAUNCHED

     

    Kochi Metro Rail line is aligned to pass through Silver Sand Island with a Metro Station at Mobility Hub next door.

  • General

    Kochi is financial capital of Kerala and very popular station for army personnel. Kochi is well connected by Road, Rail, Air and Sea. It is also gateway for people visiting Lakshadweep Islands.

    Scheme

    ANNUAL REGISTRATION OPEN

    Concept

    264 DUs in three towers have been planned. Two towers will be 27 (B+S+26) storeyed and one tower will be 15 (S+14) storeyed. Helipads are being provided on 27 storeyed towers to meet the NBC norms. Adequate parkings have been catered in basements, stilts and in open. Adequate lifts are being provided in all towers.

     Central Amenities

    A club house with community hall, few shops, recreation room & health club has been planned.

    Eligibility

    As per Master Brochure.

    Probable Date of Completion

    JUN 2017

    Contact Details

    Project Director

     

     

    AWHO CUSTOMER RELATIONSHIP
    MANAGEMENT CELL


    011-23012619, 23792411,
    23792413, 23792416
    FAX : 011-23010599
    E-MAIL ID : This email address is being protected from spambots. You need JavaScript enabled to view it.
  •  

     

    Ser No Types of DUs Super Area (Sqft) Cost of DUs
    1st Floor Typical Floor Latest Costing
    (i)

    MDA

    (2 BHK)

    1419
    04-DUs
    1220
    52-DUs
    (ii) DXA (2 BHK + Study) 1757
    04-DUs
    1551
    100-DUs
    (iii)

    SDA

    (3 BHK)

    2008
    04-DUs
    1765
    100-DUs

     

    The work for construction of residential complex consisting of 264 dwelling units at Silver Sand Island has commenced. It consists of two towers of Basement+Stilt+26 storey configuration, club house building, underground tanks and other ancillary structures. Salient features of the projects are as under:-

    • Basement under two towers to accommodate car parking
    • Rooftop helipads with chain link fencing on two towers to meet fire deptt guidelines
    • Automatic fire fighting system
    • Pergolas on top of towers
    • Separate Clubhouse
    • Deep piles upto 55 m depth due to sol conditions are also required for boundary walls, biogas plant, sewage treatment plant and underground water tanks besides the main towers
    • The internal roads, drains and electrical ducts are of RCC
    • The top soil is to be replaced with good earth brought from outside.