Update : As on 06-05-2025
Update : As on 05-05-2025
ADVISORY FOR 'TRANSFER OF ALLOTMENT' OF DWELLING UNITS AT DINESH VIHAR, OMR CHENNAI ![]()
Update : As on 10-10-2024
Update : As on 23-01-2023
|
CHANGE OF AWHO CHENNAI PROJECT OFFICE ADDRESS 1. It is intimated that the AWHO Chennai Project Office has been shifted from Dinesh Vihar project site. The new address is as under :- Project Director 2. For info of all allottees of AWHO Projects at Chennai |
Update : As on 07-12-2022
STATUS OF LAND PARCEL AT OMR CHENNAI
Update : As on 13-10-2022
TOUR NOTES OF MD's VISIT TO AWHO DINESH VIHAR PROJECT AT OMR CHENNAI FROM 08 - 10 SEP 2022
Update : As on 13-10-2022
REGN OF DU : DINESH VIHAR (OMR CHENNAI)
Update : As on 27-09-2022
Update : As on 22-09-2022
TOUR NOTES OF MD's VISIT TO AWHO DINESH VIHAR PROJECT AT OMR CHENNAI FROM 08 - 10 SEP 2022
Update : As on 31-05-2022
Update : As on 08-09-2021
MINUTES OF MEETING OF MD, AWHO WITH RWA(DVAOA) HELD ON 11 AUG 2021 AT AWHO CHENNAI DINESH VIHAR
Update : As on 05-07-2021
|
TAKING OVER OF FACILITY MANAGEMENT SERVICES IN RESPECT OF AWHO CHENNAI DINESH VIHAR COMPLEX BY RWA (DVAOA) 1. It is intimated that the responsibility of Facility Management Services at AWHO Chennai “Dinesh Vihar” Complex has been handed over to RWA (Dinesh Vihar Apartment Owners Association) wef 01 Jun 2021. However, all payments shall be continued to be made by PD out of Facility Management Fund in consultation with DVAOA till they intimate their account details, which should be done by DVAOA latest by 31 Jul 2021. |
Update : As on 22-06-2021
INCIDENT REPORTED AT AWHO PROJ OMR, CHENNAI
Update : As on 27-05-2021
POSTPONEMENT OF LAST DATE OF PAYMENT FOR TOWER B & C AT AWHO PROJ OMR, CHENNAI
Update : As on 10-05-2021
|
POSTPONEMENT OF CARETAKING CHARGES FOR TOWER B & C 1. Refer our web update dated 22 Feb 2021. |
Update : As on 22-02-2021
|
REVISED HANDING /TAKING OVER SCHEDULE AWHO OMR CHENNAI PROJECT (B & C BLOCK) 1. Handing / taking over schedule intimated to allottees of Tower ‘B’ & ‘C’ were under :-
2. However, keeping in view the status of electricity connection from TNEB, it is intimated that above scheduled stands amended as under:-
3. This is for information of all concerned. |
Update : As on 02-02-2021
FINAL OPPORTUNITY : OMR CHENNAI (DINESH VIHAR)
Update : As on 29-01-2021
Handing /Taking over schedule for tower ‘C’ will be as under :-
|
Ser |
Tower |
Handing Over Dates |
Last dt of payment |
Commencement of |
|
(a) |
C |
01 Mar 2021 |
30 Apr 2021 |
30 Jun 2021 |
Update : As on 23-12-2020
Update : As on 20-11-2020
Update : As on 10-11-2020
No Withdrawals will be permitted after issue of Handing / Taking Over instrs.
Update : As on 02-11-2020
Date of commencement of care taking charges for Tower ‘A’ allottees of OMR Chennai Project has been extended upto 31 Dec 2020.
Update : As on 06-10-2020
|
LATEST UPDATE 1. Refer our update dated 17 Aug 20. |
Update : As on 30-09-2020
Update : As on 29-09-2020
|
INFUSION OF FUNDS 1. Further to our update dated 17 Aug 2020. |
Update : As on 03-09-2020
OMR CHENNAI (DINESH VIHAR) : UPDATE
Update : Project as on 25-08-2020
|
CHENNAI (OMR) : TEMPORARY SUSPENSION OF REGISTRATION PROCESS 1. The registration of sale deeds at Sub Registrar office in respect of AWHO Chennai Project commenced in Oct 2019 and 59 flat owners completed the registration process till the announcement of national lockdown in Mar 2020. 2. It is informed that since Apr 2020, Registration Department has put registration of land in Thazhambur village on hold since land records are under scrutiny by Revenue Department. As a result, the registration of sale deeds of DUs of Dinesh Vihar has been placed under temporary suspension. 3. It has been verified from concerned department that survey numbers 172/1 and 173 pertaining to our Chennai project are not part of the scrutiny, however, for the time being, registration of land for entire Thazhambur village has been put on hold. 4. Since the title of AWHO Chennai land is clear, Registration Department has been approached to recommence registration process for our project. Once that materialises, flat owners shall be informed accordingly through AWHO website. 5.Inconvenience caused is regretted please. |
Update : Project as on 17-08-2020
Update : Project as on 23-06-2020
|
HANDING/TAKING OVER SCHEDULE OF AWHO PROJECT OMR CHENNAI 1. Further to our update dated 08 Jun 2020. |
Update : Project as on 08-06-2020
|
HANDING/TAKING OVER SCHEDULE OF AWHO PROJECT OMR CHENNAI 1. Further to our update dated 22 Jan 2020 and 15 May 2020. |
Update : Project as on 15-05-2020
|
HANDING/TAKING OVER SCHEDULE OF AWHO PROJECT OMR CHENNAI 1. Further to our update dated 07 Apr 2020 and extension of countrywide lockdown by Govt of India. Fresh dates to recommence handing over of DUs of tower D, E & F are postponed to 08 Jun 2020. All allottees however, will have to make the complete payment before take over. |
Update : Project as on 07-04-2020
|
HANDING/TAKING OVER SCHEDULE OF AWHO PROJECT OMR CHENNAI 1. Due to COVID-19 outbreak and subsequent nationwide lockdown, Handing/taking over of Towers ‘D’, ‘E’ and ‘F’ which was in progress prior to lockdown shall remain suspended till further intimation by this HQ. Fresh dates to re-commence handing over of DUs shall be intimated by last week of Apr 2020 based on the situation prevailing at that time. |
Update : Project as on 23-03-2020
CLARIFICATION ON ISSUES RAISED BY ALLOTTEES
Update : Project as on 09-03-2020
AWHO Project “Dinesh Vihar” is situated on Survey No 172/1 and 173. This land has been converted to residential land and the same can be verified from the website of Inspector General of Registration, Tamil Nadu
Update : Project as on 31-01-2020
AWHO REBUTTAL ON ISSUES RAISED BY ALLOTTEES
Update : Project as on 10-01-2020
|
CLARIFICATION ON REGISTRATION OF SALE DEED IN AWHO PROJECT (OMR) CHENNAI 1. It is hereby clarified that there are no amendments to the sale deed uploaded on 11 Sep 2019 and owners of the flats are requested for early registration of the DUs. |
Update : Project as on 22-01-2020
|
HANDING/TAKING OVER SCHEDULE : AWHO OMR CHENNAI PROJECT Handing/Taking over schedule for tower ‘A’ (LXA) will be as under :-
|
Update : Project as on 07-01-2020
Update : Project as on 15-10-19
|
REVISED HANDING /TAKING OVER SCHEDULE 1. Revised Handing/Taking over schedule for Tower D in OMR Chennai will be as under :- |
Update : Project as on 11-09-19
Update : Project as on 06-09-19
DEMAND SURVEY AT DINESH VIHAR, OMR CHENNAI PHASE-II FROM 09 SEP 2019 TO 07 NOV 2019
PROPOSED UNIT PLANS : AWHO OMR CHENNAI PHASE-II
Update : Project as on 21-08-19
Henceforth No withdrawal will be permitted in OMR Chennai Project after issue of Handing/Taking over Instructions and Final Statement of Account.
Update : Project as on 30-07-19
Update : Project as on 10-07-19
|
LEGALITY OF OPEN CAR PARKING WITH FIBRE SHEET 1. The Open Car Parking Areas with Fibre Sheet covering are being created to make up for the shortfall of parking areas under stilts. These areas are approved as parking areas in the approved plan. |
Update : Project as on 08-07-19
OPENING OF REGISTRATION FOR PARA MILITARY PERSONNEL
Update : Project as on 17-06-19
|
APPRECIATION FEEDBACK ON HANDING/TAKING OVER OF DUs AT OMR CHENNAI PROJECT Handing/taking over of DUs has commenced w.e.f. 22 Apr 2019. As on date, 45 DUs have been handed over. Appreciation/feedback received from some of the allottees during handing/taking over is attached for info of allottees. |
Update : Project as on 13-06-19
Update : Project as on 10-05-19
|
PROVISION OF COMMUNICATION INFRASTRUCTURE 1. Refer to the Notice on website dt 22 Mar 19 on the subject matter. |
Update : Project as on 11-04-19
DO LETTER FROM MD AWHO TO THE ALLOTTEES OF OMR CHENNAI
Update : Project as on 22-03-19
|
PROVISION OF COMMUNICATION INFRASTRUCTURE IN AWHO, CHENNAI, OMR (DINESH VIHAR) PROJECT 1. AWHO, Chenai OMR (Dinesh Vihar) project is nearing completion. Handing over of DUs of Tower ‘E’ and ‘F’ is likely to commence in Apr 2019. |
Update : Project as on 26-02-19
|
DINESH VIHAR, OMR CHENNAI PROJECT 1. Please refer “Update” uploaded on the AWHO Website on 11 Jan 2019. |
Update : Project as on 11-01-19
|
DINESH VIHAR, OMR CHENNAI PROJECT 1. Please refer “Status on ‘Handing Over/Completion of the Project’ Issue” uploaded on the AWHO Website on 03 Dec 2018. |
Update : Progress as on 31-12-18
Project Progress (Including Land Cost) : 89.70%
Constr Progress : 87.00%
Update : Project as on 24-12-18
A computerised draw for allotment of additional parking (OCPF) at OMR Chennai project was conducted by an independent Board of Officer detailed by AG’s Branch on 21 Dec 2018 at 1030h. Allottees who had opted for OCPF can view their draw results on AWHO website. Allotment letter will be fwd shortly.
Update : Project as on 20-12-18
A BOO detailed by AG’s Branch will conduct a Computerised draw on 21 Dec 18 at 1030h for allotment of addl Parking (OCPF) to the allottees of OMR Chennai.
Update : Project as on 14-12-18
|
UTILIZATION OF COMMON FACILITIES 1. Reference this office letter dt 26 May 2015. 2. All common facilities constructed in Phase-I have been charged to allottees of Phase-I only. Our letter mentioned above may please be treated as cancelled. |
Update : Project as on 03-12-18
STATUS ON VARIOUS ISSUES OF DINESH VIHAR, OMR CHENNAI PROJECT
Update : Progress as on 30-11-18
Project Progress (Including Land Cost) : 88.91%
Constr Progress : 86.00%
Update : Project as on 08-11-18
CHENNAI OMR : STAMP DUTY EXEMPTION
Update : Progress as on 31-10-18
Project Progress (Including Land Cost) : 88.12%
Constr Progress : 85.00%
Update : Project as on 31-10-18
|
2. The following amendments may please be made:- FOR. Allottees are welcome to visit the project office after prior intimation to see the progress and sample flat only. Contact numbers – 0422-266057, 3191007, 08827601666. READ. Allottees are welcome to contact Project office OMR Chennai at Contact No 044-29004431, 08650700016. |
Update : Progress as on 30-09-18
Project Progress (Including Land Cost) : 86.53%
Constr Progress : 83.00%
Update : Dinesh Vihar (as on 23-10-18)
Update : Dinesh Vihar (as on 17-10-18)
Draw for specific DU / Floor & Car Parking spaces has been held on 16 Oct 2018. Result for the same has already been uploaded on AWHO Website.
Update : Dinesh Vihar (as on 10-10-18)
Progress of work is 83% (Constr Progress) & 86.53% (Project Progress) as on 30 Sep 2018.
Update : Dinesh Vihar (as on 08-10-18)
COMPUTERISED DRAW FOR SPECIFIC FLOOR AND PARKING SPACE OMR CHENNAI PROJECT
Update : Dinesh Vihar (as on 19-09-18)
Progress of work is 81.5% as on 31 Aug 2018.
Update : Dinesh Vihar (as on 02-08-18)
Present progress is 81% as on 31 Jul 2018.
Update : Dinesh Vihar (as on 05-07-18)
Present progress is 79.84% as on 30 Jun 2018.
Update : Dinesh Vihar (as on 01-05-18)
OPTION LETTER FOR SPECIFIC FLOOR AND PARKING SPACE
Update : Dinesh Vihar (as on 16-04-18)
|
CHANGE OF PDC : OMR CHENNAI (a) In recent past a site review to ascertain the status of work in OMR Chennai was carried out. It is anticipated that PDC would be Sep 18. The revised schedule of PDC is due to value additions in the project. |
Update : Dinesh Vihar (as on 06-04-18)
Present progress is 77.4% as on 31 Mar 2018.
Update : Dinesh Vihar (as on 12-03-18)
Present progress is 77.2% as on 28 Feb 2018.
Update : Dinesh Vihar (as on 10-02-18)
Present progress is 77% as on 31 Jan 2018.
Update : Dinesh Vihar (as on 06-12-17)
Present progress is 75.5% as on 30 Nov 2017.
Update : Dinesh Vihar (as on 20-11-17)
Present progress is 74.6% as on 31 Oct 2017.
Update : Dinesh Vihar (as on 20-10-17)
BRIEF : DINESH VIHAR, OMR CHENNAI (TURNKEY PROJECT)
PDC has been revised to APR 2018.
Update : Dinesh Vihar (as on 05-09-17)
Present progress is 73.6% as on 31 Aug 2017.
Update : Dinesh Vihar (as on 03-08-17)
Present progress is 72.3% as on 31 Jul 2017.
Update : Dinesh Vihar (as on 11-07-17)
Present progress is 72% as on 30 Jun 2017.
Update : Dinesh Vihar (as on 16-06-17)
Update : Dinesh Vihar (as on 13-06-17)
Present progress is 71.35% as on 31 May 2017.
Update : Dinesh Vihar (as on 28-04-17)
|
IMPORTANT UPDATE Lorry / Tipper association in South India had called for an indefinite strike wef 30 Mar 2017, which was withdrawn on 09 Apr 2017. This has caused massive disruption in supply of building construction material for 11 days. After withdrawal notice the supplies are limping back to normal. |
Update : Dinesh Vihar (as on 30-03-17)
|
POSTPONEMENT OF PDC : OMR CHENNAI PH - I As on date the work has progressed to 68%. The work of main contract is going on as per schedule . All out efforts are being made to ensure progress as per schedule. |
Update : Dinesh Vihar (as on 02-03-17)
Present progress is 68% as on 28 Feb 2017.
Update : Dinesh Vihar (as on 08-02-17)
Present progress is 67.1% as on 31 Jan 2017.
Update : Dinesh Vihar (as on 03-01-17)
Present progress is 67% as on 30 Dec 2016.
Update : Dinesh Vihar (as on 30-11-16)
Present progress is 66% as on 30 Nov 2016.
Update : Dinesh Vihar (as on 11-11-16)
Present progress is 65% as on 31 Oct 2016.
Update : Dinesh Vihar (as on 24-10-16)
REVISION OF PAYMENT SCHEDULE : OMR CHENNAI PROJECT
Update : Dinesh Vihar (as on 04-10-16)
Present progress is 64% as on 30 Sep 2016.
Update : Dinesh Vihar (as on 15-09-16)
Present progress is 62.3% as on 10 Sep 2016.
Update : Dinesh Vihar (as on 18-08-16)
Present progress is 60.7% as on 31 Jul 2016.
Update : Dinesh Vihar (as on 08-07-16)
CLARIFICATIONS ABOUT MISINFORMATION SPREAD ABOUT AWHO PROJECT AT CHENNAI
REVISION OF PAYMENT SCHEDULE OMR CHENNAI PROJECT
* Please refer to Para 40 of AWHO Master Brochure Jul 87 (as amended).
* Due to unavoidable reasons, the physical progress is yet to match the planned progress. All efforts are being made to speed up the work and complete the work by PDC announced now.
* In order to adhere to construction linked payment schedule, it has been decided to re-schedule the existing payment schedule of OMR Chennai Project as under :-
|
(a) For Allottees with payment schedule As Under. |
||||
|
Ser No |
Type of Payment |
Instalment No |
Existing Due Date |
Revised Date of Payment |
|
(i) |
10% of Construction cost |
6th |
30 Aug 2016 |
30 Nov2016 |
|
(b) For Allottees with payment schedule As Under. |
||||
|
Ser No |
Type of Payment |
Instalment No |
Existing Due Date |
Revised Date of Payment |
|
(i) |
10% of Construction cost |
5th |
30 Aug 2016 |
30 Nov 2016 |
|
(c) For Late Allottees with Payment Schedule As Under. |
||||
|
Ser No |
Type of Payment |
Instalment No |
Existing Due Date |
Revised Date of Payment |
|
(i) |
20% of Construction cost |
4th |
30 Aug 2016 |
30 Nov 2016 |
* The above revised payment schedule be adhered to.
* There is no change in the amount of instalment and other terms & conditions as given in the booking letter.
* Revised PDC :- PDC has been revised from Dec 2016 to Jun 2017.
LETTER TO ALL ALLOTTEES FOR PROPOSED VALUE ADDITIONS
|
UTILISATION OF COMMON FACILITIES: OMR, CHENNAI PHASE I & II |
|
AWHO PROJECT OMR CHENNAI Issues of provision of piped water supply of metro water and construction of approach road from DLF garden city to the project are being pursued with the TN State Government, and are being closely monitored. As a value addition piped LPG supply to all residential units is being planned. |
ELEVATED ROAD TO CONNECT TARAMANI AND MAMALLAPURAM
HOMES IN SUBURBS TURN COSTLIER AS CITY GROWS
RENTALS IN CITY GO THROUGH THE ROOF
|
IMPORTANT NOTICE * Allottees of Chennai OMR Project are advised to remit funds through NEFT/RTGS /NET Banking to ICICI Bank account of the Project. |
ANNUAL REGISTRATION OPEN
Central Amenities
All amenities and facilities including Club House, Swimming Pool, Sports Complex, Walking/Jogging, Plaza and Fitness Centre are part of Gated AWHO Colony.
Following amenities are being provided in the towers
* CCTV Cameras – At Block Entrances, club house entrance and main entrance.
* Ledges In Dwelling Units for placing external units of air conditioners
* Fibre to home for TV, telephone etc in each dwelling unit.
* Garbage chutes at every floor.
* Power backup
* 1 KW FOR 4 & 3 BHK,
* 0.5 K W FOR 2 BHK
* Jogging, walking tracks & connecting bridges to reach central podium
* 2 x STP’s & Rainwater Harvesting pits
Amenities at Podium
* Swimming pool 25 m x 15 m
* Children park
* Fitness corner
Outdoor Hard Courts for
* Basketball
* Volleyball
* Badminton
Amenities in Club house
* Multipurpose hall
* Conference rooms
* Restaurant and bar
* 3 x Guest rooms
* Gym
* Table tennis
* Billiards room
* Library
* Squash courts
Eligibility
* Serving / Retired Army personnel and their widows who are in receipt of family pension and also parents of Unmarried Fatal Battle/ Other Casualties getting family pension are eligible to apply.
* Those who already own a DU/Plot allotted by AWHO in other station may also apply. However they will be considered as Priority II. Waitlisted registrants of Annual / Spot schemes / registrants of various Demand Surveys of other stations are also eligible to apply.
* Personnel of Assam Rifles, GREF, Air Force, Navy and their widows (in receipt of family pension) are eligible to apply.
Probable Date of Completion
SEP 2018
Contact Details
Project Director
AWHO
S No 172/1 & 173 (Near HLC School)
Post Office : Thazhampur
Tehsil : Chengalpattu
District : Kancheepuram
Chennai 600130
MANAGEMENT CELL
011-23012619, 23792411,
23792413, 23792416
FAX : 011-23010599
E-MAIL ID : This email address is being protected from spambots. You need JavaScript enabled to view it.