Update : As on 22-01-2025
|
EXECUTING OF CONVEYANCE DEED / REGISTRATION OF ALLOTTED DWELLING UNIT AT GURGAON 95, PUNE WAGHOLI AND MOHALI–114 PROJECTS |
Update : As on 28-10-2024
PARTIAL REFUND : AWHO SHANTI VIHAR, SECTOR-95, GURGAON
Update : As on 19-04-2024
|
REGISTRATION OF DUS IN GURGAON SEC-95 PROJECT The project of Gurgaon Sec-95 was completed in 2020. The registration of DU is being carried out since the project has been completed and handed over to the allottees. It is noted that even after lapse of approx 4 years, a number of allottees have not got their DUs registered. All allottees who have not got their Dwelling Unit registered till now are requested to execute the Conveyance Deed of their allotted Dwelling Units latest by 30 Jun 2024, failing which a sum of Rs 11,800/- including GST will be levied from them. |
Update : As on 26-06-2023
DISSEMINATION OF RESULTS : ELECTION OF MANAGEMENT COMMITTEE, SHANTI VIHAR, GURUGRAM
Update : As on 25-05-2023
ELECTIONS NOTICE : SHANTI VIHAR RWA ELECTION-2023
Update : As on 17-04-2023
DEFECT LIABILITY PERIOD (DLP) AS PER RERA AWHO SHANTI VIHAR, SECT 95, GURUGRAM
Update : As on 20-03-2023
ELECTIONS OF RWA SHANTI VIHAR, SECT-95, GURGAON
Update : As on 17-03-2023
|
HANDING TAKING OVER OF DWELLING UNITS : GURGAON SEC-95 1. It is intimated that OC for the project Shanti Vihar Sector 95 Gurugram was received on 20 Dec 2020 and since then handing taking over of flat started. 2. As per the Contract Provision, 16 month DLP (04 month H/T over and 12 month defect liability) was built in the contractor would complete the DLP by 20 Apr 2023. After that, the contractor would not be responsible for any defect except for the school. 3. It is requested to take over your flat prior to 20 Apr 2023 and raise your defects to be carried out by the contractor. 4. In case DUs are not taken over by allottee by 20 Apr 2023 holding charges @ Rs 50/- per day will be charged from the allottee. |
Update : As on 06-03-2023
SHANTI VIHAR, SECT-95, GURGAON RWA ELECTION
|
Final date of receiving Nomination Form on 17 Mar 23 till 1500 hrs. Date of withdrawal of Nomination by 17 Mar 23 till 1700 hrs. Conduct of Election on 26 Mar 23 (Sunday) (From 1030 hrs to 1500 hrs) Declaration of Results on 26 Mar 23. |
Update : As on 22-09-2022
ELECTION FOR RWA AT AWHO SHANTI VIHAR, SECTOR-95, GURGAON
Update : As on 19-04-2022
|
RE-SALE OF DWELLING UNITS IN SHANTI VIHAR SECT 95 GURGAON AND MYSURU (KESARE) PROJECTS TO SPOUSE OF ARMED FORCES PERSONS / ALLOTTEES 1. The higher management of AWHO has allowed resale of DUs to the spouse of Armed Forces personnel at Sect 95 Gurgaon & Mysuru (Kesare) projects. |
Update : As on 07-02-2022
|
REGISTRATION OF DUs: AWHO SECTOR 95, GURGAON 1. It has been noticed that allottes are not getting the Sale Deed of the DUs registered after taking over. As on date, Sale Deed of only 463 DUs have been registered against 829 DUs handed over to the allottees. 2. AWHO has limited staff available at site for a specified time. Registration of Sale Deeds after prolonged time may cause undue hardship to the allottees in future, when the staff is relieved. 3. Allottees who have taken over their DUs, are requested to get their DUs registered latest by 31 Mar 2022 in consultation with the Project Director. Henceforth, DUs shall be got registered preferably alongside taking possession but surely within a fortnight from the date of taking over, failing which allottee shall be responsible for any inconvenience / legal / revenue issues / increase in stamp duty or registration charges. 4. This is for information of all concerned. |
Update : As on 11-01-2022
MAINTENANCE OF SHANTI VIHAR COMPLEX
Update : As on 15-09-2021
MINUTES OF MEETING HELD ON 06 SEP 2021 WITH SHANTI VIHAR SECTOR – 95, GURGAON
Update : As on 24-06-2021
|
MAINTENANCE OF SHANTI VIHAR : AWHO SECTOR 95, GURGAON 1. Refer Website Update dated 21 Jun 2021. |
Update : As on 21-06-2021
|
HANDING TAKING OVER SCHEDULE GURGAON SECTOR-95 PROJECT
|
Update : As on 18-06-2021
REFUNDABLE SECURITY DEPOSIT FROM INTERIOR DECORATORS
Update : As on 21-05-2021
|
REVISED DUE DATE OF PAYMENT OF GURGAON SEC-95 PROJECT
|
Update : As on 05-04-2021
REGISTRATION OF DU : GURGAON SECTOR 95 (SHANTI VIHAR)
Update : As on 24-03-2021
Handing taking over schedule and due date of payment of block E, F, G, H & J of Gurgaon Sector-95 project has been revised as under:-
|
S No |
Towers |
Total DUs |
Handing Over Date |
Due Date of Payment |
Commencement of Caretaking Charge |
|
(a) |
E, F, G, H & J |
447 |
01 Jan 2021 to 15 May 2021 |
15 May 2021 |
16 Jul 2021 |
Update : As on 09-02-2021
|
INTRODUCING FREE APP BASED SECURITY MANAGEMENT SERVICES AT SHANTI VIHAR GURGAON SECTOR-95 1. It is to intimate that a firm NoBroker Technologies Solutions Pvt Ltd which runs App based Security Management Services has offered lifetime free app based services to Shanti Vihar Project, Gurgaon Sector-95 after detailed discussions and lots of negotiations with the firm. The services being provided by the firm are cited in the agreement done between AWHO and the firm. The agreement is uploaded for information of the allottees. |
Update : As on 02-02-2021
FINAL OPPORTUNITY : GURGAON SECTOR 95 (SHANTI VIHAR)
Update : As on 21-12-2020
|
OCCUPATION CERTIFICATE SHANTI VIHAR GURGAON SECTOR – 95 Occupation Certificate (OC) in respect of AWHO Shanti Vihar Gurgaon Sector - 95 project has been issued on 18 Dec 20 vide Memo No ZP-713/SD(DK)/2020/22326 by Haryana Town & Country Planning Department, Chandigarh. The same is shared with the allottees for information please. CLICK HERE |
Update : As on 03-12-2020
MINUTES OF MEETING HELD ON 27 NOV 2020
Update : As on 02-12-2020
SANCTION OF PARTIAL LOAD 400.000 kw AGAINST REVISED SANCTION ULTIMATE LOAD 8720 KW OR CD 9689 KVA
Update : As on 19-11-2020
|
REVISED SCH OF SHANTI VIHAR, SECT-95, GURUGRAM 1. Ref web update regarding above subject on 22 Oct 20.
|
Update : As on 10-11-2020
No Withdrawals will be permitted after issue of Handing / Taking Over instrs.
Update : As on 26-10-2020
UPDATE ON SHANTI VIHAR SECTOR-95, GURUGRAM
Update : As on 22-10-2020
REVISED HANDING/TAKING OVER SCHEDULE AND DUE DATE OF PAYMENT
Update : As on 20-10-2020
|
MTG WITH ALLOTTEES OF SHANTI VIHAR, SECT-95, GURUGRAM 1. Shanti Vihar Welfare Committee had requested for a mtg on 24 Oct 2020 at site. |
Update : As on 16-10-2020
|
GRANT OF OCCUPATION CERTIFICATE (OC) FOR SHANTI VIHAR, SECTOR 95, GURUGRAM
|
Update : As on 15-10-2020
MINUTES OF MEETING WITH REPS OF SHANTI VIHAR, SECT-95 GURUGRAM HELD AT SITE ON 19 SEP 2020
Update : As on 13-10-2020
Approved as built Drawing by DTCP
Update : As on 29-09-2020
CONVEYANCE DEED FOR REGN OF DUS AT SECTOR -95, GURGAON
Update : As on 25-09-2020
|
ISSUE OF CLEARANCE LETTER: GURGAON SECTOR-95 PROJECT Clearance letter to the allottees of blocks C, D, L, Q & R of Gurgaon Sec-95 proj are being issued wef 17 Sep 2020 to those allottees of above blocks who have paid their final instalment and submitted the legal documents as asked for vide handing/taking over instructions letter. Those allottees of above blocks who have not paid their final instalment and not submitted required legal documents are requested to pay their due instalment and submit their required legal documents by 15 Oct 2020 to enable us to issue clearance letter. Handing/Taking over of DUs will be subject to receipt of OC/Part OC from the competent authorities. |
Update : As on 03-09-2020
GURGAON SECTOR 95 (SHANTI VIHAR)
Update : As on 31-08-2020
MINUTES OF MEETING WITH REPS OF SHANTI VIHAR, SECT-95 GURUGRAM AND OFFICIALS OF AWHO ON 10 AUG 2020
Update : As on 18-08-2020
|
VISIT OF ALLOTTEES TO TOWERS C, D, L, Q & R : AWHO SEC-95, GURGAON Further to web update dt 07 Jul 2020. Allottees of towers C, D, L, Q & R, who have paid their final amount as per FSA and desirous of taking over their DUs in Oct – Nov 2020 may visit the DUs (after tying up suitable date and time with the Project Director Col Karunesh Kumar (Retd) at Mobile No 9717770341 or Rxn Cell Mob Nos 8447430314 & 9891592251) and notify their observations, if any. Same shall be recorded by the PD in register meant for this purpose and rectified before 01 Oct 2020 so that when allottees reach the site to take over their DU post 01Oct 2020, they get a ready DU without any observations or shortcomings. This shall facilitate smooth handing / taking over. |
Update : As on 31-07-2020
|
SHIFTING OF 220 KVA HT LINE AWHO PROJ GURGAON SEC-95 1. Based on representation by a few allottees, a case was taken up with Bhakra Beas Management Board (BBMB), the owner of the line to see the feasibility of either making it underground or sifting the same. |
Update : As on 07-07-2020
|
RESCHEDULE OF COMMENCEMENT OF HANDING OVER AND LAST DATE OF PAYMENT 1. Further to our ‘Update’ dt 05 Jun 2020 as regards the commencement of handing over of DUs in AWHO Sector-95, Gurgaon. The obtaining of ‘Occupation Certificate ‘ (OC) is likely to be further delayed due to the lockdown and related issues of COVID – 19, leading to delay in site visit by the concerned state govt officials. Accordingly, the commencement of handing over of DUs of the first lot of towers ie, Towers C,D,L,Q & R is postponed till 30 Sep 2020 with the last date of payment as 15 Oct 2020. All out efforts will be made to commence handing over prior to 30 Sep 2020 and allottees will be intimated in advance should the situation improve. The schedule of handing over of DUs of balance towers shall be announced once the actual handing over commences. |
Update : As on 05-06-2020
|
POSTPONEMENT OF HANDING/TAKING OVER SCHEDULE AND LAST DATE OF PAYMENT The commencement of Handing/Taking Over Schedule in r/o AWHO Sector – 95, Gurgaon is presently postponed till 15 Jul 2020. This is due to existing lockdown restrictions which has affected the availability of labour at site as also the process of obtaining the Occupation Certificate. Accordingly, the exact handing over schedule for the first lot of towers ie Towers C, D, L, Q & R shall be announced after the `Occupation Certificate’ has been obtained and sufficient labour is available for the final finishing prior to handing over. Presently the last date of payment in r/o Towers C, D, L, Q & R is also postponed to 30 Jul 2020. |
Update : As on 07-04-2020
|
RE-SCHEDULE OF LAST DATE OF PAYMENT IN R/O AWHO PROJECT GURUGRAM SECT 95 Due to COVID-19 outbreak and subsequent nationwide lockdown, the last date of payment for allottees of Tower ‘C’, ‘D’, ‘L’, ‘Q’ & ‘R’, of AWHO Project Gurugram Sect 95 has been postponed to 30 Jun 2020. Dates for commencement of handing/taking over will be intimated later. Handing/taking for Tower ‘C’, ‘D’, ‘L’, ‘Q’ & ‘R’ will commence wef 15 Jun 2020. This shall be further reviewed in last week of May 2020 based on situation prevailing at that time. |
Update : As on 25-03-2020
Due to the COVID-19 outbreak and subsequent nationwide lock down the last date of payment for Gurgaon 95 has been postponed as under :-
| S.NO. | LAST DATE OF PAYMENT | POSTPONED TO |
| 1 | 23 Mar 2020 & 20 Apr 2020 |
25 APR 2020 |
Update : As on 23-03-2020
|
HANDING/TAKING OVER SCHEDULE Handing/Taking Over Schedule of AWHO Sector – 95, Gurgaon is presently postponed by a month due to the effect of COVID-19 Virus, leading to delay in obtaining Occupation Certificate (OC), due to restricted functioning of the State Government. The fresh schedule shall be communicated subsequently, depending on the ground situation. |
Update : As on 18-02-2020
|
ARBITRATION / COURT CASES UPDATE/PROGRESS Contract concluded with M/S Ramprastha Promoters & Developers Pvt Ltd. was cancelled due to default of contractor and contract to get the balance work completed through other agency at Risk & Cost of Contractor has been concluded and in progress. AWHO invoked the arbitration. Arbitral proceedings are in progress. Any amount received by AWHO through decree of court after exhausting all legal remedies by both the parties, shall be credited to Project Account. |
Update : As on 07-02-2020
MINUTES OF MEETING HELD ON 31 JAN 2020 AWHO SECTOR-95 GURGAON
Update : As on 27-01-2020
HANDING / TAKING OVER INSTRUCTIONS AND STATEMENT OF ACCOUNTs
Update : As on 14-01-2020
Update : Progress as on 31-12-19
Project Progress (Including Land Cost) : 96.06%
Constr Progress : 93.15%
Update : As on 19-12-19
|
GURGAON SEC-95 : H/O OF DUs Construction on the project has recommenced after lifting of ban by the Hon’ble Supreme Court on 10 Dec 2019, which remained suspended from 26 Oct 2019 to 09 Dec 2019. Accordingly it is proposed to commence the handing over of DUs from the third/ fourth week of Mar 2020. The final statement of account shall be sent to the allottees as per towerwise schedule of handing over from Jan 2020 onwards. |
Update : As on 18-12-19
|
DRAW FOR ALLOTMENT OF ADDL PARKING G-95 PROJECT 1. Draw for additional parking at Gurgaon Sector-95 project will be held on 10 Jan 2020 at 1100 hrs onwards at HQ AWHO by an internal Board of Offrs. Additional parking once allotted in the above draw will not be cancelled in any circumstances. Hence, allottees who have given their option for additional parking are requested to re -consider their willingness for the same if they so desire latest by 31 Dec 2019. No repeat NO representation will be accepted thereafter. |
Update : As on 20-11-19
|
GURGAON SEC-95 : LATEST UPDATE Due to enhanced pollution in the NCR region, the Hon’ble Supreme Court has banned all construction activities including operation of DG Sets wef 01 Nov 2019 till further orders. |
Update : As on 05-11-19
|
GURGAON SEC-95 : VISITING HOURS In order to avoid mishaps and interference in constr activities, all allottees/ visitors are requested to visit the site only on Saturdays and Sundays as per the following timings :- |
Update : Progress as on 31-10-19
Project Progress (Including Land Cost) : 95.68%
Constr Progress : 92.50%
Update : As on 29-10-19
|
DU NUMBERING AND PARKING PLANS |
|
|
DU NUMBERING PLANS |
|
|
BASEMENT CAR PARKING PLANS |
|
|
STILT CAR PARKING PLANS |
|
|
OPEN CAR PARKING PLANS |
|
Update : Progress as on 30-09-19
Project Progress (Including Land Cost) : 94.82%
Constr Progress : 91.00%
Update : As on 11-09-19
|
GURGAON SEC-95 : VISITING HOURS All allottees wishing to visit the project are requested to do so between 1000 hr and 1700 hr on all days (including Sunday). This is to avoid any mishap during the hours when adequate staff in not present at site. |
Update : As on 03-09-19
|
SITE VISIT ON 31 AUG 2019 1. A site visit by allottees was conducted on 31 Aug 2019. Approx 28 allottees alongwith Lt Gen Narendra Singh (Retd) were present for the visit. The allottees also included two members of the PMG. |
Update : Progress as on 31-08-19
Project Progress (Including Land Cost) : 94.24%
Constr Progress : 90.00%
Update : As on 26-08-19
OPTION LETTER FOR SPECIFIC FLOOR AND PARKING SPACE
Update : Progress as on 31-07-19
Project Progress (Including Land Cost) : 93.26%
Constr Progress : 88.30%
Update : As on 08-07-19
OPENING OF REGISTRATION FOR PARA MILITARY PERSONNEL
|
LATEST UPDATE 1. Col AK Rawal along with following visited the site on 05 Jul 19 from 1500 to 1700hrs :- |
Update : Progress as on 30-06-19
Project Progress (Including Land Cost) : 92.51%
Constr Progress : 87.00%
Update : As on 26-06-19
SITE VISIT BY ALLOTTEES ON 22 JUN 2019
Update : As on 24-06-19
MD’s LETTER TO ALL ALLOTTEES DATED 17 JUN 2019
Update : As on 05-06-19
Photographs for Jun month has been uploaded.
Update : As on 14-05-19
|
LATEST UPDATE : AWHO SEC-95, GURGAON 1. A number of allottees have queried on the construction of schools as part of AWHO Sector-95, Gurgaon project and the confirmation of payment for the same due on 31 May 2019. |
Update : Progress as on 31-05-19
Project Progress (Including Land Cost) : 91.08%
Constr Progress : 84.50%
Update : As on 02-04-19
INTERACTION WITH ALLOTTEES ON 30 MAR 2019
Update : Progress as on 31-03-19
Project Progress (Including Land Cost) : 89.81%
Constr Progress : 82.30%
Update : As on 07-03-19
Dismantling of the Chemical Factory has commenced
Update : Progress as on 28-02-19
Project Progress (Including Land Cost) : 87.62%
Constr Progress : 78.50%
Update : As on 15-02-19
|
CLOSURE OF CHEMICAL FACTORY 1. Due to sustained efforts by AWHO with the "State Pollution Control Board" the owner of the chemical factory adjacent to AWHO Sector–95, Gurgaon has been asked to shut down and subsequently shift the factory. |
Update : As on 06-02-19
GURGAON SEC-95 : CLARIFICATION ON SALE OF SCHOOL
Update : Progress as on 31-01-19
Project Progress (Including Land Cost) : 86.76%
Constr Progress : 77.00%
Update : As on 31-01-19
Update : As on 10-01-19
OPENING OF REGISTRATION FOR ASSAM RIFLES, GREF, AIR FORCE, NAVAL AND INDIAN COAST GUARD (ICG)
Update : Progress as on 31-12-18
Project Progress (Including Land Cost) : 85.89%
Constr Progress : 75.50%
Update : As on 13-12-18
FEEDBACK ON QUALITY RELATED ISSUES RAISED BY CERTAIN ALLOTTEES
Update : Progress as on 30-11-18
Project Progress (Including Land Cost) : 84.63%
Constr Progress : 73.10%
Update : As on 15-11-18
DO LETTER FROM AN ALLOTTEE OF G-95 PROJECT
Update : Progress as on 31-10-18
Project Progress (Including Land Cost) : 83.94%
Constr Progress : 72.10%
Update : As on 25-10-18
|
Update of Individual Running Ledger Account (IRLA) (a) Immediately after transferring amount through bank, allottees are required to intimate Registration No, UTR/NEFT No with Date of Transaction and amount details by e-mail to AWHO. |
Update : Progress as on 30-09-18
Project Progress (Including Land Cost) : 82.67%
Constr Progress : 70.00%
Update : Shanti Vihar (as on 16-10-18)
GURGAON SEC-95 : LETTER FROM MD, AWHO
Update : Shanti Vihar (as on 04-10-18)
GURGAON SEC-95 : LETTER FROM MD, AWHO
Update : Shanti Vihar (as on 04-09-18)
GURGAON, SECTOR-95 : LATEST UPDATE
Update : Shanti Vihar (as on 23-08-18)
|
GURGAON SEC-95 : LATEST UPDATE 1. The new contractor M/S Baba Construction Pvt Ltd were given the work order and handed over the site on 11 Aug 2018. |
GURGAON SEC-95 : ALLOTTEES INFORMATION UPDATE
Update : Shanti Vihar (as on 16-08-18)
OPENING OF SPOT SCHEME FOR AWHO HOUSING PROJECT GURGAON, SECTOR-95 FROM 16 AUG 2018 TO 14 SEP 2018
Update : Shanti Vihar (as on 14-08-18)
Update : Shanti Vihar (as on 07-08-18)
GURGAON SEC-95 : REVISED PAYMENT SCHEDULE
Update : Shanti Vihar (as on 28-05-18)
GURGAON, SECTOR - 95 PROJECT : LATEST UPDATE
Update : Shanti Vihar (as on 17-05-18)
GURGAON, SECTOR - 95 PROJECT : LATEST UPDATE
Update : Shanti Vihar (as on 09-02-18)
GURGAON, SECTOR - 95 PROJECT : LATEST UPDATE
Update : Shanti Vihar (as on 19-01-18)
|
LATEST UPDATE : SECTOR-95, GURGAON 1. Consequent to the cancellation of contract with M/s Ramprastha Promoter & Developers Pvt Ltd (RPDL) on 05 Jan 2018, action to re-commence construction as per the timelines given below has been initiated :-
2. It is assured that AWHO is taking all necessary steps/ actions which are in the best interest of the allottees to ensure early completion of work with high standard of execution. |
Update : Shanti Vihar (as on 05-01-18)
* RERA Registration of the project has been completed.
* The contract of M/s Ramprastha Promoter & Developers Pvt Ltd has been cancelled on 05 Jan 18.
* The sequence of actions for restarting the work has been initiated. Early commencement of construction is envisaged. Further updates will be given soon.
Update : Shanti Vihar (as on 14-11-17)
LATEST UPDATE ON AWHO PROJECT AT SECTOR-95, GURGAON
Update : Shanti Vihar (as on 25-09-17)
|
LATEST UPDATE : SECTOR-95, GURGAON A meeting was held as per schedule between the Executive Committee of AWHO and the apex management team of M/s Ramprastha Promoters & Developers Pvt Ltd on 19 Sep 2017. The contractor underlined his commitment to complete the project regardless of cost. A fund infusion plan of Rs 25 Crore in three transactions starting 31 Oct onward till 15 Dec 2017 was formalized targeting completion within twelve months. |
Update : Shanti Vihar (as on 05-09-17)
|
UPDATE AWHO PROJECT SECTOR-95 : GURGAON * The concerns regarding slow progress of work at the site were discussed by the higher management during the 134th Executive Committee Meeting of AWHO held on 23 Aug 17. |
Update : Shanti Vihar (as on 17-08-17)
|
LATEST UPDATE : SECTOR-95, GURGAON 1. A meeting was held between representatives of the allottees and MD, AWHO at HQ AWHO on 16 Aug 2017. |
Update : Shanti Vihar (as on 21-07-17)
|
AWHO PROJECT AT SECTOR – 95 GURGAON 1. The rate of progress at site has been under intense scrutiny by HQ AWHO. Several measures have been implemented to accelerate the pace of work. |
Update : Shanti Vihar (as on 16-04-17)
Update : Shanti Vihar (as on 19-04-17)
Progress of work is 68% as on 31 Mar 2017.
Update : Shanti Vihar (as on 28-02-17)
|
ENHANCEMENT OF BACKUP POWER SUPPLY 1. A communication to allottees of Gurgaon Sector-95 inviting their views on enhancing the backup power supply to 5 KW for LXA/SDA/DXA and 3 KW for SFA against the present provision of 1.2 KW was sent by email, and the same was also uploaded on Website. |
Update : Shanti Vihar (as on 07-02-17)
Progress of work is 66.5% as on 31 Jan 2017.
Update : Shanti Vihar (as on 03-01-17)
Progress of work is 65% as on 31 Dec 2016.
Update : Shanti Vihar (as on 06-12-16)
ENHANCEMENT OF BACKUP POWER SUPPLY
Keeping in mind the ongoing difficulties that our allottees are facing due to existing banking scenario, it has been decided to further extend the due date for payment of 6th/5th/4th/3rd (as applicable) installment from 16 Dec 2016 to 16 Jan 2017. Rest NO change.
Update : Shanti Vihar (as on 02-12-16)
Progress of work is 63% as on 30 Nov 2016.
In view of the present bank scenario, due to demonetization of currency and numerous requests received from allottees, the due date for payment of 6th/5th/4th/3rd (as applicable) installment for Gurgaon, Sector-95 Project has been extended from 30 Nov 2016 to 16 Dec 2016. Rest NO change.
|
Important Update Due to concerted pressure on the Contractor to speed up the work, an agreement to infuse additional funds into the project has been arrived at. An Escrow Account has now been opened between the builder, M/s Ramprastha Promoters & Developers Pvt Ltd and AWHO to ensure application for the work only. This will help in flow of funds and consequently speeding up of the work, with adequate accountability attached. |
Update : Shanti Vihar (as on 07-11-16)
Physical progress is approx 62% as on 31 Oct 2016.
Update : Shanti Vihar (as on 13-10-16)
GURGAON SECTOR-95 : IMPORTANT UPDATE
Update : Shanti Vihar (as on 12-09-16)
Physical progress is approx 60.27% as on 31 Aug 2016.
|
REGISTRATION CLOSED w.e.f. 24 AUG 2016
However, registration for widow quota is still open for eligible widows only.
|
Update : Shanti Vihar (as on 08-08-16)
Physical progress is approx 60% as on 31 Jul 2016.
Update : Shanti Vihar (as on 08-07-16)
|
UPDATE : GURGAON SECTOR - 95 Due to inadequate resources infusion by the Contractor, the progress at site is slow. However, continuous efforts are on to expedite the progress. Meetings with top management have been held three times in last four months and also fortnightly review meetings are being held with at site to ensure increased speed of work. Due to these efforts, working strength, which was around 300 till the months of Feb/ Mar, has increased to 600 plus in the last month. Pressure is on to increase resources further. The allottees will be kept updated. |
Physical progress is approx 59% as on 30 Jun 2016.
* RCC structure and brick work completed.
* External plaster and finishes under progress.
|
REVISION OF PAYMENT SCHEDULE 1. Based on progress of construction, it has become necessary to revise the payment schedule and PDC of the above project. The instalment of 10% cost of DU which is due on 15 Jun 2016 has been postponed as under:-(a) Allottees Whose 6th (10%) Instalment is Due for Payment on 15 Jun 2016.
(b) For Late Allottees Who are Not Covered Under Para 1(a) Above.
2. There is no change in the amount of instalment and other terms and conditions. 3. The PDC of the Project has also been revised from Nov 2016 to Jun 2017. 4. Initial allottees who have already made lump sum payment as per Para 4 (a) of the Booking letter may ignore the communication regarding postponement of instalment. 5. The inconvenience caused due to this unavoidable postponement is regretted. |
||||||||||||||||||||
With reference to notice posted on 03 Jul 2015 regarding provisioning of grabage chutes, the majority view is against the same. Therefore, it has been decided not to provide garbage chutes in the project.
ANNOUNCEMENT : CONSTRUCTION OF SCHOOLS AT AWHO PROJECT GURGAON SECTOR-95 AS MANDATED BY HUDA
ROUTE TO AWHO SECTOR -95 SITE FROM DELHI (From Pataudi Road)
ROUTE TO AWHO SECTOR -95 SITE FROM DELHI (From NH-8 )
